Technical fault halts services of Mumbai monorail on next day of inauguration
Shortpedia
Content TeamImage Credit: Shortpedia
The same train which was used for the inaugural run by CM Devendra Fadnavis yesterday, after facing some technical glitch stopped at Wadala depot at 12.25 pm today. Fednavis flagged off the train on the 2nd phase of the Chembur-Wadala-Jacob Circle monorail network on Sunday but the train today stopped after a cable entangled its front. The passengers were then removed from the train to shift them to another train.